Use and Care Manual

www.usaprocom.com
15200124-01D
INSTALLATION
PRESSURE TESTING HEATER GAS CONNECTIONS
1. Open equipment shutoff valve (see Figure
12, page 14).
2. Open main gas valve located on or near
gas meter for natural gas or open pro-
pane/LP supply tank valve.
3. Make sure control knob of heater is in the
OFF position.
4. Check all joints from equipment shutoff
valve to control valve (see Figure 13 or
14, page 14). Apply a noncorrosive leak
detection uid to all joints. Bubbles form-
ing show a leak.
5. Correct all leaks at once.
6. Light heater (see Lighting Instructions on
page 17). Check all other internal joints
for leaks.
7. Turn off heater (see To Turn Off Gas Ap-
pliance, page 18).
AAA
Battery
Positive
UP
BATTERY INSTRUCTIONS
CAUTION: Do not dispose of
batteries in re, batteries may
explode or leak.
Battery is included.
Remove battery when depleted.
Only install or replace with a AAA battery.
Be sure to observe proper polarity (+/-)
when installing or replacing the battery.
Damage due to improper battery installation
may void the warranty on the product.
For long periods of non-operation, remove
battery from all components for safety.
Unscrew ignitor cap and install a AAA battery
with the + pointing out. Replace cap.
Figure 15 - Installing Battery in Ignitor