Specification

13 support@cedarsummitplay.com
Note: When installing Pan Bolts make sure to look at holes so bolts go through the side with the
round recess and the lock nuts go through the side with the hexagonal recess. (g. 3.3)
A: Fit 2 TNR2 Slide Elbows together and attach with 8 (PB1) 1/4 x 3/4” Pan Bolts (with lock nut) as shown in
g. 3.1. It is very important to attach bolts as indicated.
B: Repeat Step A 3 more times to create 4 Elbow Sections in total.
C: Attach TNR3 Extend Flange RT and TNR3 Extend Flange LT together using 9 (PB1) 1/4 x 3/4” Pan Bolts
(with lock nut) as shown in g. 3.2. This creates the Flange Assembly.
Fig. 3.2
Fig. 3.3
Fig. 3.1
Step 3: Slide Section Assemblies
Part 1
Hardware
41 x 1/4 x 3/4” Pan Bolt
(1/4” lock nut)
PB1
Other Parts
1 x TNR3 Extend Flange RT
1 x TNR3 Extend Flange LT
8 x TNR2 Slide Elbow
Use a 7/16” open end
wrench for nuts
Lock
Nut
TNR3
Extend
Flange RT
TNR3
Extend
Flange LT
PB1
TNR2
Slide
Elbow
Lock
Nut
Lock
Nut
Lock
Nut
PB1
Flange
Assembly
PB1
PB1
PB1
Lock
Nut
x 4