User's Manual

Table Of Contents
INSTALLATION GUIDE
Confidential, Proprietary Information
Title: PolBEAMER PCS (3.2) Array System-
Assembly and Operation Manual
Doc. No.:
913000801
Rev.: 01
Page: 34 of 91
2.7. PCS 1x8x8 Array Assembly Instructions
1. Mount the securing clamps (12) on the pole (1) at the location approx. close to the
bottom side of the mounting assay. Tighten the wing nuts using 9/16 wrench
2. Mount the Mounting assay. On the pole (1) and secure the clamps (2) with the wing
nuts (3). Tighten the wing nuts using 9/16 wrench
3. Untighten the bolts (6) a bit so the hanging arms (7)&(11) are free to swivel around the
secondary pole (10).
4. Pull the plunger (8) and turn the bottom set of (7)& (11) counterclockwise until the
plunger (8) locks in place about 60 deg of the center position.
5. Pull the plunger (8) and turn the top set of (7)& (11) clockwise until the plunger (8)
locks in place about 60 deg of the center position.
6. Insert the arrays threaded pins (13) for the bottom and (15) for the top at the groove of
the lower forks (7) and then press the top threaded pins in place at the upper forks (11).
Make sure the latch(9) turns up and then falls back in place to secure the top pins of
(13)&(15)
7. Tighten the wing nuts of all the pins (13)&(15). Using 9/16 wrench.
8. Release the plungers (8) and rotate the antennas back in place.
9. Tighten the bolts(6) using 9/16 wrench
10. Connect the Rx and Tx Cables coming out of the rear divider which is
mounted on the lower half of the secondary pole(10) to the top (16) and
bottom(14) connector flanges.
11. To adjust the Azimuth :
12. Untighten the wing nuts (3) and rotate till you have reached the position .
13. Tighten the nuts (3).
14. To adjust the tilt of the antenna :
15. Untighten the 6 bolts (4) (on both sides of the mounting assay).
16. Release the latch(5) and adjust the tilt , once the tilt is set lock in position using the
latch(5).
17. Tighten the bolts (4) .