User Manual

Confidential, Proprietary Information
Title: PCS FlexBeamer
®
RF Repeater
System A &O Manual
Doc. No.:
913002500
Rev.: 00
Page: 30 of
80NUMPAGES
2.4.5. Installing the RAC on the Pole
1. Mount the RAC assembly on the pole and secure the two rear clamps with 4
threaded screws use 4 nuts(3/8”-16 UNC) flat and spring washers . Tighten the nuts
C
C
a
a
u
u
t
t
i
i
o
o
n
n
D
D
o
o
n
n
o
o
t
t
o
o
v
v
e
e
r
r
t
t
i
i
g
g
h
h
t
t
e
e
n
n
t
t
h
h
e
e
n
n
u
u
t
t
s
s
,
,
u
u
s
s
e
e
a
a
5
5
-
-
8
8
l
l
e
e
n
n
g
g
t
t
h
h
w
w
r
r
e
e
n
n
c
c
h
h
a
a
p
p
p
p
l
l
y
y
i
i
n
n
g
g
2
2
3
3
4
4
-
-
2
2
5
5
9
9
L
L
b
b
x
x
I
I
n
n
m
m
a
a
x
x
m
m
o
o
m
m
e
e
n
n
t
t
.
.
2. Connect the Rx and Tx cables coming from the FLEXBEAMER® unit to the
proper connectors at the bottom of the RAC.
3. Connect the Rx and Tx cables going down to the BAU to the proper connectors on the
bottom of the RAC.
4. Seal the connectors , after tightening them manually, with proper sealing accessories as
explained above.
5. Connect the grounding cable connected to the RAC stud ( 1/4” dia. located at the
bottom of the RAC) to the Tower ground stud. Tighten the grounding bolt properly.
Figure 8:
R
R
A
A
C
C
I
I
n
n
s
s
t
t
a
a
l
l
l
l
a
a
t
t
i
i
o
o
n
n
BAU Rx
Tx
BAU Tx
RS-485
AC/DC
Supply
Ground Stud
Mounting
Clamps
Lifting
Hook
TxD
RxD
Rx