User Manual
Table Of Contents
- CONTENTS
- FIGURES
- TABLES
- INTRODUCTION
- INSTALLATION GUIDE
- Applicable Documents
- Scope
- Important Safety Precautions
- ICU Operation Instructions
- Array Installation
- Assembly Instructions for the PCS 1x4x4 Array
- PCS 1x8x8 Array Assembly Instructions
- Beamer System Setup
- BEAMER System Sector Array Installation Record
- Test Procedure for Measuring the Rx Gain Balance
- Smart-Terminal Program Description
- BSM (BEAMER SYSTEM MANAGER) PROGRAM
- Functions
- Requirements for Operation
- User Interface Description
- Status Reports
- BSM S/W
- BSM Main Screen
- Comm Port Selection
- Password Entering
- Host Selection
- Installation of ICU in System
- Failure Conditions Selection
- BEAMER Limits Definition
- Shut Down Conditions Enable/Disable
- ICU Limits Definition
- System Definition
- Sub-Array and BEAMER Setting
- Sub Array Setting
- BEAMER Installation
- Column and Row Definition
- Sub-Array Status and Attenuator Setting
- Control & BEAMER Setting
- BEAMER Control
- ICU Status
- ICU CTRLR Status
- ICU Properties
- SOFTWARE DOWNLOAD GUIDE
- WARRANTY
- Exclusions
- Warranty Limitations
- INDEX
Proprietary Information
Title: BEAMER Array System-
Assembly and Operation Manual
Doc. No.: 913000000 Rev.: 00
Page: 23 of 92
2. INSTALLATION GUIDE
2.1. Applicable Documents
• PC to ICU Protocol, version No.9450002XX
• BEAMER to ICU Protocol No.9450003XX
• BEAMER specifications No.9530003XX
• ICU specifications, Scope No.9530006XX
This document describes the installation of the BEAMER system, as integrated into Customer’s BTS.
2.2. Scope
This document describes the installation of the BEAMER System, as integrated into customer’s -BTS.
The BEAMER 1X4X4 Array System is basically a modular tower top LNA and power amplifier, with
programming and modularity features that are uncommon with other, comparable systems. It replace
the entire RF front-end of a PCS BTS and offers controllability and improved performance at reduced
size and cost.
The document details the instructions for programming and field installation of the BEAMER system.
It is intended to be used by customer technical personnel, who are trained to install and service the
BEAMER system.
2.3. Important Safety Precautions
The system is supplied following extensive acceptance production line tests. Usually, lab tests will
not be required before installing the unit at the customer's location. One should always be aware of
the necessary safety precautions, assuring that the BEAMER system will be fully functional after the
installation.