User Manual
Table Of Contents
- CONTENTS
- FIGURES
- TABLES
- INTRODUCTION
- INSTALLATION GUIDE
- Applicable Documents
- Scope
- Important Safety Precautions
- ICU Operation Instructions
- Array Installation
- Assembly Instructions for the PCS 1x4x4 Array
- PCS 1x8x8 Array Assembly Instructions
- Beamer System Setup
- BEAMER System Sector Array Installation Record
- Test Procedure for Measuring the Rx Gain Balance
- Smart-Terminal Program Description
- BSM (BEAMER SYSTEM MANAGER) PROGRAM
- Functions
- Requirements for Operation
- User Interface Description
- Status Reports
- BSM S/W
- BSM Main Screen
- Comm Port Selection
- Password Entering
- Host Selection
- Installation of ICU in System
- Failure Conditions Selection
- BEAMER Limits Definition
- Shut Down Conditions Enable/Disable
- ICU Limits Definition
- System Definition
- Sub-Array and BEAMER Setting
- Sub Array Setting
- BEAMER Installation
- Column and Row Definition
- Sub-Array Status and Attenuator Setting
- Control & BEAMER Setting
- BEAMER Control
- ICU Status
- ICU CTRLR Status
- ICU Properties
- SOFTWARE DOWNLOAD GUIDE
- WARRANTY
- Exclusions
- Warranty Limitations
- INDEX
INSTALLATION GUIDE
Proprietary Information
Title: BEAMER Array System
Assembly and Operation Manual
Doc. No.: 913000100 Rev.: 00
Page: 50 of 92
Beamer
Array
[G=13.5dBi]
G
1:4
Divider
Loss=L
G
ABT
BTS
Input
P
in
Pout (max)=10dBm
G=30±1dB
GC=0 to15.5dB
L=0 to
6dB
Pout (max)=33dBm
G=37±0.5dB
GC=0 to
EIRP=52.5dBm(max)
Combined
in the Air
Beamer 4
G
G
Beamer 3
G
Beamer 2
Beamer1
-20
dbm
Pin=-5dBm to -20dBm
+8
dbm
Coax
15.5dB
+39dbm
[L=6db]
+2
dbm
-4
dbm
Figure 21: Tx link budget example
2.8.5.1. Estimating the Required Tx-ABT Gain
The purpose of this procedure is to verify that the BEAMER system available gain is sufficient to
cover the expected RF losses, before starting the actual Tx calibration.