Installation Guide

installation
cedar discovery
Half-Rounds
Align left side flange with nearest
alignment line of course below that
allows for proper fit into corner post
or J-Channel (Fig. 1).
d. Engage lock securely into
continuous top lock of course
below (Fig. 3).
e. Pull up tight and nail according to
“NAILING PROCEDURES.”
f. Continue installing full panels in
the course, following Steps c-e.
g. To finish course, refer to previous
section titled “Last Panel on Each
Course”.
Third Course
(and all odd courses)
a. Perfection Shingle Double 7 ",
Triple 5 " and Hand-Split Shake
Measure the distance from the first
RIGHT alignment line “0” of the
course below into the corner post
or J-Channel and subtract 1/4" (see
“A” on Fig. 2).
b. Perfection Shingle Double 7 ” and
Hand-Split Shake – Measure from
the left side flange of panel and cut
to this length (see “B” on Fig. 2).
Perfection Shingle Triple 5 " –
Measure from the left end of the
lowest panel and cut to this length.
c. Engage lock securely into
continuous top lock of course
below.
d. Perfection Shingle Double 7 " and
Hand-Split Shake – Align left side
flange with RIGHT alignment line
“0” of the course below (Fig. 4).
Perfection Shingle Triple 5 " –
Align lowest panel left edge with
right alignment line “0” of the
course below (Fig. 5).
Half-Rounds – Align left side
flange with nearest alignment
line of course below that allows
for proper fit into corner post or
J-Channel (Fig. 6).
e. Pull up tight and nail according to
“NAILING PROCEDURES.”
f. Continue installing full panels in
the course, following Steps c-e
above.
g. To finish course, refer to section
titled “Last Panel on Each
Course” on page 58.
Alignment Line
of Course Below
Fig. 1
A. Measure Distance
For New Odd Course
C
1/4" Clearance
B
RIGHT
Alignment
Line “0”
Left Side Flange
Fig. 2
Fig. 3
RIGHT Alignment Line
(of Course Below)
Left Side Flange
“0”
Fig. 4
RIGHT Alignment Line “0”
(of Course Below)
Left End of
Lowest Panel
Fig. 5
Align for
Proper Fit
into Corner
1/4" Clearance
Fig. 6