Installation Guide
half-round gutters
leaf relief
94
Fig. 1
Fig. 2
Every 24"
Fig. 3
Mark
Fig. 4
1/2"
Mark
Fig. 5
1/2"
Mark
Fig. 6
Bend tab on Leaf Relief
®
as shown
in Figure 1.
Release spring clip on front of gutter
and bend up back tab holding gutter.
(Fig. 2).
Place Leaf Relief
®
on gutter, bend
hanger back tab over the back of the
Leaf Relief
®
. Fasten hanger spring
clip over Leaf Relief
®
(Fig. 3).
Continue installing Leaf Relief
®
panels, overlapping 1/2", attaching
with screws through Leaf Relief
®
and front lip of gutter every 24".
As required, a screw can be inserted
through overlapping panels to reduce
sagging.
Wrap-Around Strap Hangers
Existing Gutters
Place first Leaf Relief
®
panel on
gutter in front of hanger and mark
location of strap (Fig. 4).
Cut and notch Leaf Relief
®
as shown
in Figure 5 and lay in position on
gutter.
Place next section of Leaf Relief
®
on
gutter, mark location of strap, then
cut and notch as shown in Figure 6.
continued
Spring Clip Bar Hangers continued