Installation Guide

frieze, rake and band boards
accessories installation
Lineals
Choose either a 3.5˝ or 5˝ lineal,
depending on the look you want to
achieve.
At Eave or Gable, butt the small leg
of the starter against, but not under
the J-Channel that was installed to
receive the soffit.
Nail the starter in place every 8˝ to
12˝ with nails centered in nailing
slots. (Fig.1)
Push the locking leg of the lineal into
the starter channel.
Nail the Lineal in place every 8˝ to
12˝ with nails centered in nailing
slots.
Install utility trim into the lineal
receiving channel, making sure to
align nail slots with lineal nail slots.
Install last course of siding. (
Fig. 2)
In some situations you may have to
shim the utility trim or you can use a
Double utility trim.
8" - 12"
8" - 12"
Fig.1
Fig. 2
35