Installation Guide

final course
insulated siding installation
Take the height measurement of the
remaining open section in several
locations.
Subtract 1/4" from each location to
allow for movement. (Fig. 1)
Cut the panel to required
measurement. (Fig. 2)
Cut back foam 2" for 1-1/4"
J-Channels or 3-1/2" for 2-1/2"
J-Channels (Fig. 3)
Remove foam to
depth of channel
Fig. 1
Fig. 2
Fig. 3
56
Final Course