Installation Guide
transition from horizontal to vertical
vertical siding installation
Finish the last course of horizontal
siding with the J-Channel and
finish trim. Install a drip cap and
a J-Channel. The top piece of
J-Channel must have minimum
3/16" (4.8mm) diameter weep holes
drilled no more than 24" (610mm)
apart to allow for water runoff.
drip cap
gap for
drainage
Fig. 1
58
Transition from Horizontal to Vertical
(Fig. 1)