Specifications
▲
!
9. DRILLING (Refer to Figs. 17-19)
N.B.: switch on the cooling system before starting the drill (§ 5).
9.1) Drill fitted with “short” type broach cutter (for drilling thicknesses of up to 1").
The drilling sequence may be started with the drill fitted with the broach cutter (§ 7.1),
clamping end piece (§ 8.1), positioning template (§ 8.3), the drill being clamped to the rail
(§ 8.4), as follows:
9.1.1)
Connect the female quick-coupling of the SR 5000 coolant unit to the male
coupling (01) on the drill (Fig. 19).
9.1.2) Open the tap (02) fitted on the coolant unit hose.
9.1.3)
Using the lever (36) bring the guide bit almost in contact with the rail (Fig. 17a);
keeping the release pawl (39) pressed, release the lever from its cup and return it to
the initial position (Fig. 17b), which will enable the travel of the lever (36) to be used
in the most advantageous way.
Fig. 17a
Fig. 17b
Fig. 17c
<>
36
39
8.2) Assembly of the clamping device on the drill
The clamping device is fitted to the front plate of the drill, centred by means of the reference
pin supplied and secured with the two screws M 8x25 (35) also supplied.
The assembly is illustrated in Fig. 14.
Clamping device
FIG. 15 – ASSEMBLY OF THE POSITIONING TEMPLATES
Drilling machine
front plate
35
screws M6x16
reference
pin
MPAF...
MPAU
8.3) Assembly of the positioning templates
(Refer to Fig. 15)
The type MPAF .. and MPAU positioning
templates are secured to the front plate (04) of
the drill by means of the two socket head cap
screws M 6x16 supplied.
04
FIG. 14 – ASSEMBLY OF THE
CLAMPING DEVICE
21
18










