Install Drawing

AIR INTAKE
AIR OUTLET
MINIMUM DISTANCE
AIR INTAKE
FRONT VIEW
LEFT SIDE VIEW
RIGHT SIDE VIEW
REAR VIEW
"DO NOT LIFT BY ROOF"
GROUNDING LUG
Ø30.2 [Ø1.2]
LIFTING HOLES 4 CORNERS
CABLE ACCESS HOLE
642
[25.3]
731.9
[28.8]
637.6
[25.1]
1226
[48.3]
76.2 [3.0]
PEA GRAVEL
MINIMUM
1218
[47.9]
FUEL INLET - 14-20KW (1/2" NPT)
8 & 10KW (3/4" NPT) - USE SUPPLIED ADAPTER
REQUIRED FUEL PRESSURE: NATURAL GAS = 5-7" WATER COLUMN
LIQUID PROPANE (VAPOR) = 10-12" WATER COLUMN
244.4
[9.6]
178.9
[7.0]
**ALL DIMENSIONS IN:
MILLIMETERS [INCHES]
457.2
[18.0]
914 [36.0]
MINIMUM OPEN AREA
ON SIDES AND FRONT
Bulletin 0176910SBY / Printed in U.S.A. 03.08, rev. 04.09
8, 10, 14, & 17 kW Steel (Bisque)
17 & 20 kW Aluminum (Gray)
INSTALLATION DRAWING 0G8280-B
Air-Cooled Generators
410cc Single Cylinder 14.8 HP, 530cc V-Twin 18 HP
992cc V-Twin 32 HP, and 999cc V-Twin 36 HP
ISSUE DATE 01/29/08

Summary of content (1 pages)