Instruction manual

Robinison 22HP Manual
7
Step 8 CCPM (cyclic collective pitch mixing) Swashplate Assembly
Starting with the inside race, apply threadlock and attach two short balls (Tip 1) directly across from each other,
similarly attach two medium balls to the remaining holes. Attach three short balls (Tip 2) to the outside race, each 120
degrees apart. The extra location is used for the anti-rotation bracket assembled later.
Step 7 Washout Assembly
Attach two Medium Balls (Tip 2) to the Washout Mixing Arms (
note they are attached from the flat side of the arm).
Using one slide tube inserted from the flat side, secured using one M3x16 Button Head Screw and one 3x7mm Flat
Washer per arm. Do not overtighten the arm as it is threaded into the plastic washout base. Also note, the screw is
attached on the left when installed later on the main shaft. Press the radius link on to the inner short balls on the
swashplate.
#HI3152C
Washout Arm
x 2
#HI3152A
Radius Arm with Pin x 2
#HI3152C
Slide Tube x 2
#CNLR1015
Medium Ball x 2
M3x16 Button
Head Screw x 2
M3x7 Flat
Washer x 2
Pre Assembled in Kit
#HI3146C
CCPM Swashplate
#CNLR1014
Short Control Ball x 5
#CNLR1015
Medium Control Ball x 2
Short Control Ball
Plastic Anti-rotation pin &
M3x16 Socket Screw