User's Manual Chapter 3

Chapter 3. Installation FibeAir 1500 Installation & Operation Manual
3-40 Installation Verification Revision 2.0
3.11.2. Checking the Frequency Plan
1. Enter the Management software and select Configuration ½ Set
frequency.
The Frequency Plan window is displayed.
Figure 3-40 Frequency Plan Window
2. Verify that the lightning bolt between the two ODU images is displayed
in green.