Installation Guide

Air Barrier System Continuity – Figures 15 - 18
Maintain air barrier system continuity at wall, ceiling, oor and foundation intersections.
Use recommended sealants. Seal between framing and film overlaps.
Coordinate installation details with framing and insulation trade contractors.
Insulate rim and band joists with ber glass insulation batts wrapped or pillowed
with MemBrain
sheeting.
Figure 15: Building envelope intersection locations.
Interior floor
intersection
(See Figure 17:
Detail B)
Interior partition
wall intersection
(See Figure 16:
Detail A)
Foundation wall
intersection
(See Figure 18:
Detail C)
www.certainteed.com 9