Installation Guide
Air Barrier System Continuity – Figures 15 - 18
• Maintain air barrier system continuity at wall, ceiling, oor and foundation intersections.
Use recommended sealants. Seal between framing and film overlaps.
• Coordinate installation details with framing and insulation trade contractors.
• Insulate rim and band joists with ber glass insulation batts wrapped or pillowed
with MemBrain
™
sheeting.
Figure 15: Building envelope intersection locations.