User manual
Barrett Technology, Inc.
BA4-310 System User Manual Version 1.1
55
[ ] 14.
Finally, tension the cable circuit by adding a pre-tension slightly less than ½ the 1
st
-
stage cable’s breaking strength. This is accomplished by: applying 0.68 N-m [96 oz-in]
to the lubricated pre-tensioning set screw using the torque driver provided with your
system,
slowly
moving the joint through its full range of motion, applying the specified
torque again to remove the new cable slack, and repeating this process until moving the
joint no longer reduces the tension in the cables (
i.e.
the full pre-tension has been
propagated throughout the cable circuit).