User Manual

Installation
Installation requirements
1.The lift shall work indoor where there is no any corrosive or combustible substance;
and should not approach the steam pipe, hot air pipe, or other central heating
equipment.
2.Voltage: 100-120V or 220-240V, Power: 38-76W
Installation
1. Determine the installation position of the hanger based on the screen size and the
focal length of the projector, open the ceiling hole (the opening position is
recommended to be 3cm less than the length and width of the bottom plate of the
electric hanger), and leave the inspection hole on one side.
2. Open the mounting holes on the cement roof (or mounting bracket) according to the
holes on the mounting plate, and fix the mounting plate with four M8
×
12 expansion
screws (the center position of the mounting plate and the center position of the ceiling
hole need to be consistent).
3.Insert the box into the mounting plate and stabilize it in a relatively middle position
(the four M6x12 screws between the box and the mounting plate can be fixed after the
commissioning of the machine and then powered on.) Then unfold the hanger.
4. First fix the universal claw on the projector (try to be at the center of gravity of the
projector), and then install the projector and the claw as a whole to the lower end of
the cabinet body of the hanger, and install a set of screw rod and connecting pieces for
adjustment upper limit.