Instruction manual

Central Heating Mode
To be able to supply central heating, the selector switch
(19 Fig. 1) must be in ‘~~~~ 3 position. This will be
confirmed by the green indicator light 0 (22 Fig. 1).
When there is a demand for heating (either from the
room thermostat or the external programmer) and the
boiler temperature control is calling for heat.
The pump starts and at a flow rate of 4ltr/min the central
heating flow switch operates allowing the ignition
sequence to begin.
The first stage solenoid (12a Fig. 3) and safety solenoid
(12~ Fig. 3) open together to allow gas to the burner.
I&
The ignition sequence begins and a continuous high
speed spark ignites the gas. As soon as a flame is
11
detected the orange indicator bulb 0 (23 Fig. 1) will
light. After 45 seconds the second stage solenoid (12b
Fig. 3) opens to allow the full gas rate.
-------4
If a flame is not detected, after eight seconds, the
security solenoid closes and shuts off the gas. The red
17
lockout indicator bulb f (24 Fig. 1) will light. Press the
RESET button to attempt to relight.
The central heating flow temperature is controlled by
the central heating control thermistor (16 Fig. 3).
The boiler has been designed to minimise cycling and
will not attempt to relight for at least 3 minutes after the
27
boiler thermostat has been satisfied (this can be set to
30 seconds if required, see maintenance and service
guide).
When the room thermostat is satisfied the burner will
switch off and the pump will remain running for a further
3 minutes.
Fig. 3
Note:
It is possible to override the 3 minute delay by
pressing the RESET button (25 Fig. 1).
e
C&M
9
-.-