Instruction manual

DHW
Filling the Cylinder
l
Ensure that all fittings and valves are correctly
installed and are water tight
l
Flush all debris from the supply pipes before
connecting to the cylinder
l
Open the furthest hot water tap from the DUO 55
cylinder
l
Open the mains water inlet valve and allow the
cylinder to fill. Allow water to flow from the tap for a
few minutes to ensure any installation debris is
flushed through the system
l
Open all other taps in turn to purge any remaining
air from the system
l
Check all connections for leaks
Check the operation of the safety valves
l
Manually open the temperature and pressure relief
valve (39 Fig. 17) for a few seconds.
l
Check that the water flows away through the tundish
and discharge pipework and does not overflow.
l
Ensure that the flow of water has stopped and that
the valve has reseated itself.
l
Repeat the above check for the expansion relief
valve.
Central Heating
l
Open flow and return valves on the boiler (28 & 29
Fig. 18)
l
Open the automatic air vent (20 Fig. 19)
l
Fill system and vent radiators
l
Set system pressure and remove filling loop
l
Check for leaks
l
Manually check pump is free to turn
l
Switch on electrical supply
l
Turn selector switch (19 Fig. 20) to heating and hot
water position
l
Allow pump to run for several minutes.
l
Isolate electrical supply.
l
Drain boiler and check water filter (34 Fig. 19) for
installation debris.
l
Replace filter and recharge system.
Indirect Heating
l
Ensure that the cylinder heating coils are filled and
purged of air.
Fig. 17
1% 28 27 29
Fig. 18
Fig. 19
16
m
--