Operating instructions

Please check that you are familiar with the installation
requirements before commencing work.(section 6)
Installation
The installation kit included with the flue components
comprise following items :
- Hanging bracket
- A paper template (showing the dimensions of the boiler with
5 mm side clearances, fitting instructions and
commissioning instructions)
- Connection tails
- Screws and wall plugs
- Connection washers
- Pre-piping jig
- Installation manual
Method of positionning the boiler on the wall.
The paper template can be used to ensure the correct
positioning of kitchen cabinets etc. It also details the
commissioning instructions.
The paper template is fixed to the wall and used to locate the
position of the hanging bracket, the centre for the flue hole
and, if required, the fixings for the pre-piping jig.
Drill and plug the wall and secure the hanging bracket using
the screws provided (refer to the paper template drawings~.
Remove the boiler from its packaging as shown in fig. 13 and
remove the outer case as shown in fig.14. Place the boiler on
the wall on the hanging bracket after removing the pre-
installation jig.
If required, there is space for all piping to pass behind the
Fig. 13
Fig. 14