User`s manual

20
The life of individual components vary and they will need
servicing or replacing as and when faults develop.
The fault finding sequence chart in Section 8 will help to
locate which component is the cause of any malfunction,
and instructions f
or removal, inspection and replacement of
the individual parts are given in the following pages.
To ensure efficient safe operation, it is recommended that
the water heater is serviced annually by a competent per-
son.
Before starting any servicing work, ensure both the gas
a
nd electrical supplies to the water heater are isolated
and the water heater is cool.
Before and after servicing, a combustion analysis should be
made via the flue sampling point.
After servicing, preliminary electrical system checks must
be carried out to ensure electrical safety (i.e. polarity, earth
continuity, resistance to earth and short circuit).
All testing and maintenance operations on the water heater
require the removal of the casing.
7.1.1 Removing the front panel :
1. Unlock the two clamps locking A (see Figs. 28);
2. Remo
v
e the control knobs and the scre
w below
(see
Fig. 29).
3. Remo
v
e the front panel from the rest of the casing
(see Fig.
30)
.
FI
G
.28
6. SERVICING INSTRUCTIONS
FIG.29
FIG.30
7. REPLACEMENT OF PARTS
7.1 To Gain General Access
A