FIELD WIRING
WIRING INCOMING POWER TO THE
CONTROLLER
1. Check the controller mains input power requirement from the
controller to be installed. (120V or 240V)
WARNING: Ensure input voltage selection switch is in the correct
position.
2. Route conduit using Fig. 1 for selecting the recommended hole to
bring the mains input power wiring inside the enclosure.
3. Bring appropriate gauge (recommended 12-14awg) mains
incoming power wires to land them inside the controller as per
instructions in the Power and Ground section.
a. For single phase (120Vac/240Vac) mains incoming power, run
the wires for line, neutral and earth ground.
b. For 240Vac three phase, select two phase legs to use as line
and neutral for controller L and N connections. Also include the
earth ground connection. Multiple single phase loads must be
evenly distributed between the
3 phases.
4. Make connection for mains Line and Neutral wires to the filter
board L and N terminals as shown at right.
5. Check that the factory installed jumper is present between the L
terminal and COM terminal at the brake relay as shown in Fig. 1 on
page X.
NOTE: The system may now be powered. Jump to Initial Setup on
page XX of this manual.
To prevent damage to the controller:
Ensure that incoming power is properly bonded to earth
ground
Verify voltage before making connections at the controller.
Consult a licensed electrician for questions about
grounding and load balancing.
Accessories connection
Conduit to junction box A
Conduit to junction box B
Incoming power
NEED REFERENCE FOR
FILTER BOARD WIRING
ILLUSTRATION
ART NOT
FINAL