User's Manual

13
REAR INSTALLATION ONLY
3
2
3
1
2
STANDARD INSTALLATION ONLY
1
2
Open the gate and line up the front bracket so the chain will be level with the
idler pulley and parallel to the ground. Weld the front bracket in this position.
Close the gate and line up the rear bracket so the chain will be level with the
idler pulley and parallel to the ground. Weld the rear bracket in this position.
Route the chain through the operator.
Connect the chain to the brackets using the eye bolt hardware. Chain should
not be too tight or have excessive slack.
DO NOT run the operator until instructed.
3
NOTE: The chain should have no more than 1 inch of sag for every 10 feet of chain
length.
DO NOT run the operator until instructed.
The chain should have no more than 1 inch of sag for every 10 feet of chain
length.
1
NOTE: This installation will require two extra idler pulleys. Make sure all
exposed pinch points are guarded. Refer to Gate Construction Information on
page 4.
Move the back pulley to the bottom hole in the operator.
Close the gate and align the bottom bracket so the chain will be level
with the bottom idler pulley and parallel to the ground. Weld the bottom
bracket in this position
Align the top bracket so the chain will be level with the top idler pulley
and parallel to the ground. Weld the upper bracket in this position.
Route the chain through the operator.
Connect the chain to the brackets using the eye bolt hardware. Chain
should not be too tight or have excessive slack.
1
2
3
4
4
4
4
5
5
STANDARD INSTALLATION ONLY + REAR INSTALLATION ONLY
INSTALLATION
Idler Pulley MUST have safety cover.

Summary of content (8 pages)