Replacement Part List
Table Of Contents
- ENGLISH
- Contents
- Safety Symbol and Signal Word Review
- Preparation
- Assembly
- Installation
- STEP 1 Determine the Header Bracket Location
- STEP 2 Install the Header Bracket
- STEP 3 Attach the Rail to the Header Bracket
- STEP 4 Position the Garage Door Opener
- STEP 5 Hang the Garage Door Opener
- STEP 6 Attach the Emergency Release Rope and Handle
- STEP 7 Install the Door Bracket
- STEP 8 Connect the Door Arm to the Trolley
- STEP 9 Install the Door Control
- STEP 10 Wire the Door Control to the Garage Door Opener
- STEP 11 Attach the Warning Labels
- STEP 12 Install the Protector System®
- STEP 13 Wire the Safety Reversing Sensors
- STEP 14 Connect Power
- STEP 15 Align the Safety Reversing Sensors
- Adjustments
- Battery Backup
- myQ® App Control
- Camera
- Operation
- Maintenance
- Troubleshooting
- Warranty
- Automatic Garage Door Opener Safety & Maintenance Guide
- Repair Parts
Lag Screw 5/16”-9x1-5/8”
HARDWARE
16
Wall Mounting
Holes
UP
Optional Mounting
Holes
Ceiling Mounting
Holes
UP
Highest Point
of Garage
DoorTravel
6” (15 cm)
Maximum
Door Spring
Horizontal
Line
Header Wall
2x4
Structural
Support
Header
Bracket
Garage Door
Vertical
Centerline of
Garage Door
Header
Bracket
Garage Door
Lag
Screw
Door
Spring
Finished Ceiling
Vertical
Centerline of
Garage Door
Header Wall
Lag Screw
Installation
STEP 2 Install the Header Bracket
You can attach the header bracket either to the wall above the garage door, or to the ceiling. Follow the
instructions which will work best for your particular requirements. Do not install the header bracket over
drywall.Ifinstallingintomasonry,useconcreteanchors(notprovided).
OPTION A - WALL INSTALLATION
1. Center the bracket on the vertical center line with the bottom edge of the bracket on the horizontal
line as shown (with the arrow pointing toward the ceiling).
2. Mark the vertical set of bracket holes. Drill 3/16” pilot holes and fasten the bracket securely to a
structuralsupport with the hardware provided.
OPTION B - CEILING INSTALLATION
1. Extend the vertical centerline onto the ceiling as shown.
2. Center the bracket on the vertical mark, no more than 6” (15 cm) from the wall. Make sure the
arrow is pointing away from the wall. The bracket can be mounted ush against the ceiling when
clearance is minimal.
3. Mark the side holes. Drill 3/16” pilot holes and fasten bracket securely to a structural support with
the hardware provided.
WALL INSTALLATION
CEILING INSTALLATION