- STEP 1 Determine the header bracket location
- STEP 2 Install the header bracket
- STEP 3 Attach the rail to the header bracket
- STEP 4 Position the garage door opener
- STEP 5 Hang the garage door opener
- STEP 6 Install the light bulbs
- STEP 7 Attach the emergency release rope and handle
- STEP 8 Install the door bracket
- STEP 9 Connect the door arm to the trolley
- STEP 10 Install the door control
- STEP 11 Wire the door control to the garage door opener
- STEP 12 Attach the warning labels
- STEP 13 Install the Protector System®
- STEP 14 Wire the Safety Reversing Sensors
- STEP 15 Connect power
- STEP 16 Ensure the safety reversing sensors are aligned
- Adjustments
- Battery Backup
- Operation
- Maintenance
- Troubleshooting
- Accessories
- Warranty
- Contact Information
- Repair Parts
- SPANISH

12
Installation
STEP 2 Install the header bracket
You can attach the header bracketeither to the wall above the garage door, or to the ceiling. Follow the
instructionswhich will workbest for your particular requirements.Do not install the header bracket over
drywall. If installing into masonry, use concrete anchors (not provided).
HARDWARE
Lag Screw 5/16"-9x1-5/8"
OPTION A WALL INSTALLATION
1. Center the bracket on the vertical centerline with the bottom edge of the bracket on the
horizontal line asshown.
2. Mark the vertical setofbracketholes.Drill 3/16" pilot holes and fasten the bracketsecurely to a
structural support with the hardware provided.
UP
Wall Mount
Optional Mounting
Holes
Vertical
Centerline of
Garage Door
(Header Wall)
Header
Bracket
2x4 Structural
Support
Door Spring
(Garage Door)
Highest Point
of Garage
Door Travel
Horizontal
Line
Lag Screw
5/16"-9x1-5/8"
OPTION B CEILING INSTALLATION
1. Extend the vertical centerline onto the ceiling as shown.
2. Center the bracketon the vertical mark, no more than 6" (15 cm) from the wall. Make sure the
arrow is pointing away from the wall. The bracketcan be mounted flush against the ceiling
when clearance is minimal.
3. Mark the side holes.Drill 3/16" pilotholes and fasten bracketsecurely to a structural support
with the hardware provided.
UP
(Header Wall)
Ceiling Mounting
Holes
(Finished Ceiling)
Vertical
Centerline of
Garage Door
Header
Bracket
6"
(15 cm)
Maximum
Door Spring
(Garage Door)
Lag Screw
5/16"-9x1-5/8"