Operation Manual
Table Of Contents
- Owner's Manual
- CONTENTS
- Preparation
- Assembly
- Installation
- STEP 1 Determine the header bracket location
- STEP 2 Install the header bracket
- STEP 3 Attach the rail to the header bracket
- STEP 4 Position the garage door opener
- STEP 5 Hang the garage door opener
- STEP 6 Install the light bulbs
- STEP 7 Attach the emergency release rope and handle
- STEP 8 Install the door bracket
- STEP 9 Connect the door arm to the trolley
- STEP 10 Install the door control
- STEP 11 Wire the door control to the garage door opener
- STEP 12 Attach the warning labels
- STEP 13 Install the Protector System®
- STEP 14 Wire the Safety Reversing Sensors
- STEP 15 Connect power
- STEP 16 Ensure the safety reversing sensors are aligned
- STEP 17 Ensure the door control is wired correctly
- Adjustments
- Operation
- Maintenance
- Troubleshooting
- Accessories
- Warranty
- Contact Information
- Repair Parts
- Spanish

12
Installation
STEP 2 Install the header bracket
You can attach the header bracket either to the wall above the garage door, or to the ceiling. Follow the
instructions which will work bestfor your particular requirements.Do not install the header bracket over
drywall. If installing into masonry, use concrete anchors (not provided).
HARDWARE
Lag Screw 5/16"-9x1-5/8"
OPTION A WALL INSTALLATION
1. Center the bracket on the vertical centerline with the bottom edge of the bracket on the
horizontal line as shown.
2. Mark the vertical setof bracketholes. Drill 3/16" pilot holes and fasten the bracket securely to a
structural support with the hardware provided.
UP
Wall Mount
Optional Mounting
Holes
Vertical
Centerline of
Garage Door
(Header Wall)
Header
Bracket
2x4 Structural
Support
Door Spring
(Garage Door)
Highest Point
of Garage
Door Travel
Horizontal
Line
Lag Screw
5/16"-9x1-5/8"
OPTION B CEILING INSTALLATION
1. Extend the vertical centerline onto the ceiling as shown.
2. Center the bracket on the vertical mark,no more than 6" (15 cm) from the wall. Make sure the
arrow is pointing away from the wall.The bracket can be mounted flush againstthe ceiling
when clearance is minimal.
3. Mark the side holes.Drill 3/16" pilot holes and fasten bracket securely to a structural support
with the hardware provided.
UP
(Header Wall)
Ceiling Mounting
Holes
(Finished Ceiling)
Vertical
Centerline of
Garage
Door
Header
Bracket
6" (15 cm)
Maximum
Door Spring
(Garage Door)
Lag Screw
5/16"-9x1-5/8"