Instructions / Assembly

17
Installation
STEP 8 Install the door bracket (continued)
OPTION B ONE-PIECEDOORS
1. Center the door bracket on the top of the door, in line with the header bracketas shown.
2. Mark either the leftand right,or the top and bottom holes.
Metal Doors:
Drill 3/16" pilotholesand fasten the bracketwith the self-threading screws provided.
Wood Doors:
Drill 5/16" holesand use 5/16"x2" carriage bolts,lockwashers and nuts (not provided) or 5/16"x1-
1/2" lag screws (not provided) depending on your installation needs.
NOTE: The door bracket may be installed on the top edge of the door if required for your installation.
(Refer to the dotted line optional placement drawing.)
For a door with no exposed
framing, or for the optional
installation, use lag screws
5/16"x1-1/2" (not provided)
to fasten the door bracket.
Vertical
Centerline
of Garage
Door
Optional
Placement
of Door
Bracket
Door Bracket
Header Bracket
Header Wall
2x4 Support
(Finished Ceiling)
Door
Bracket
Top of Door
(Inside Garage)
Top Edge of
Door
Optional
Placement
Optional
Placement
Top
Edge
of Door
Top of Door
(Inside
Garage)
Door
Bracket
Carriage Bolt 5/16"x2"
(not provided)
Nut 5/16"-18
Lock Washer 5/16"
Metal Door
Wood Door
Self-Threading
Screw 1/4"-14x5/8"