Converting Straight-through Operation to Corner Operation
Installation
Track Assembly
Guide
Step 1: Open the hood and remove the
track assembly. Pull straight up and lift out
of the machine.
Step 2: Rotate the track assembly 180°
and reinstall it in the machine.
Step 3: The guide which was at the back
of the machine is now at the front. Remove
the fasteners holding the guide in place.
Save the fasteners.
Step 4: Rotate the guide counter-clockwise
to the right-side of the track assembly.
Use the fasteners to secure the guide.
Track Assembly Conversion:
Optional Splash Shield Installation for S/N
D141012079 and above:
The splash shield reduces splash-out whenever the hood is raised.
Step 1: Remove the two 1/4-20 x 1/2" hex head bolts located on the
right-hand side of the machine as shown in the illustration below.
Save the bolts.
Step 2: Raise the hood and fit the splash shield
channel guide over the edge of the tank. Refer to
illustration “Splash Shield (insided view)” above.
Step 3: Reinstall the bolts removed in step 1.
Step 4: Open and close the hood to ensure it
operates smoothly.
Step 5: Conversion is complete.
IMPORTANT:
The splash shield must be installed before the machine is placed in its
permanent location.
Corner
Wall
Right-side
of machine
Bolts
1/4-20 X 1/2"
Splash
Shield
Splash
Shield
(inside view)
Channel
Guide
! IMPORTANT !
An optional Splash Shield, P/N 334890, is available for corner operation and must be installed
before the machine is placed in its permanent location.