User's Manual

44
Installation Instructions _______
Initial Start-up
Initial Start-up
Checkthedirectionofrotationoftheconveyorbeltbyobservingthedirectionarrow
decalonthelargeconveyordrivesprocket.Thesprocketislocatedonthesideof
theunloadsection.
Ifrotationdirectionisincorrect,reversewiresL1andL2onthedisconnectswitch
sideofthemainelectricalconnectionterminalblocklocatedinsidethecontrol
cabinet.
Adjusttheconveyorbeltdriveclutch.Theclutchislocatedonthelargeconveyor
drivesprocketonthesideoftheunloadsection.
Toadjust:
Tightentheclutchnutonthecenterofthedrivesprocketuntiltheconveyorbegins
tomove.
Haveapersonofaveragebuild(about185lbs.)holdthebeltwith
bothhandsandpullagainstthedirectionoftravel.
Continuetighteningtheclutchnutuntilmaximumeffortagainstthe
directionoftravelisrequiredtostopthebelt.
CHECK AND ADJUST CLUTCH MONTHLY.
Checkthealignmentoftheconveyorbelt.Adjustthetake-upassembliessothat
ConveyorRollers(A)trackevenlyonConveyorSprockets(B).
ChecktheEnergySentinel(idlepumpshut-off)byplacingatrayordishonthe
movingconveyorbelt.
Thepumpswillstartastheobjectentersthetunnelofthemachine.
Theoptionalecono-rinsepumpstartswiththenalrinse.
Checkpumpmotorrotation,CWwhenviewedfromtherearofmotor.
Checkthenalrinsetemperatureastheobjectentersthenalrinsearea.
TheFinalrinsetemperaturemustbe180-195°F.
Adjustthetemperatureoftheincomingwatersupplyifnecessary.
Adjusttheboosterthermostatsettingifnecessary.
ChecktheFinalrinsewaterpressureastheobjectentersthenalrinsearea.
Thenalrinsepressuremustbe20-22PSI.
AdjustthePressureReducingValvesettingifnecessary.