Warranty

9
ENGLISH 100236
ASSEMBLY
12.5
其余
3) Install the Tow Bar and Support Leg
1. Attach the tow bar to the bracket on the bottom of
the splitting beam opposite the axle. Secure with
two (2) M12x80 bolts and M12 lock nuts. (A)
4) Install the Hydraulic Hose (Tank)
1. Using a clamp d25, connect and secure the
hydraulic hose to the back of the beam/base of the
tank. (A)
2. Leave the other end of hose unconnected at this
time.
5) Install the Engine and Hydraulic Hose (pump)
1. Place the engine on the engine bracket with the pump
facing the cylinder. (A)
2. Line up the holes in the base of the engine and secure
the engine with four M8x40 bolts, M8 washers, M8 lock
washers and M8 nuts. Tighten to 18 ft-lb. (A)
2. Attach the support leg to the same bracket on
the bottom of the splitting beam. Secure with one
M12x80 bolt and M12 lock nut. (B)
3. Secure the support leg in the vertical/horizontal
position by inserting the L-pin through the bracket
and support leg and securing with hair pin clip. (C)
Do not tow with support leg in the down position
or if loose. The support leg must be locked in the
upright position before towing. Towing the unit with
the support leg in the down position or loose may
cause property damage and/or injury.
WARNING
3. Connect the oil pipe to the connection on the bottom of
the pump. Secure with the d25 clamp. (B)
4. Connect the other end of the oil pipe to the connection
on the base of the beam/tank. Secure with the d25
clamp. (C)
BC
A
A
A
B
C C