Owner manual

43
_________ 
Initial Start-up
Supply Connections
Performthefollowingchecksandadjustmentsbeforeplacingthemachineintoservice.
• Checktheinteriorofthemachineandremoveanyforeignmaterial.
• Checktheexteriorofthemachine—makesurethattheconveyorbeltisfreeoftapeand
foreignmaterial.
Bafes –
Tankbafesredirecttheowofwaterfromthesprayarmsystemsbackintothetanks.This
preventswaterlossandkeepsthewash,rinse,andnalrinsewaterinthepropertank.
Checkthebafes—makesurethattheyareinstalledandpositionedcorrectly.
Closethetankdrainvalvesalongthelowerfrontofthemachine.
Openthewatersupplyvalves.Checkforleaksandtakecorrectiveactionasrequired.
Openthesteamsupplyvalves(ifapplicable).Checkforleaksandtakecorrective
actionifrequired.
Turnthemainpoweronatthebreakerpanelorfuseddisconnectswitch.
Machinemainpower
Electricboostermainpower(ifapplicable)
FlipthePowerSwitchonthefrontoftheControlCabinettothe"ON"position.
TheRedpoweronlightwillilluminate.
Themachinewillbegintollwithwater.
Allowthemachinetocompletelyllwithwater.
Thewaterwillshutoffautomatically.
Checkforleaksandtakecorrectiveactionifrequired.
Monitorthetankthermometersforthepropertemperaturereading.
Allowsufcienttimeforthetankheattoreachoperatingtemperature.
Eachtemperaturegaugeismarkedwithitsproperoperatingrange.
Movetheconveyorshut-offshelflocatedattheendoftheunloadsectiontowardthe
machine.Thisresetstheautomaticconveyorstopsystem.
Whenanobjectontheconveyorcontactstheshut-offshelf,theconveyorstops.
PresstheGREENstartbuttononthefrontofthecontrolcabinet.