User's Manual

1-1
Introduction
1
This document provides step-by-step instructions on how to install any CT500 ChargePoint
®
Charging
Station.
Before installing the CT500
Ensure that the appropriate wiring, circuit protection, and metering is in place at the installation
location. For details, refer to the specifications (page 1-2) and wiring diagrams (page 1-3).
Ensure that the type of modem in the CT500 station that you are installing is compatible with the type
of modem coverage available at the installation site (CDMA or GPRS).
Disconnect power.
Determine the appropriate mounting location for the CT500. The CT500 is designed to be secured to
a masonry wall or a hollow wall with wood studs 16” apart. If this is not the case, prepare an
appropriate mounting surface.
Familiarize yourself with the installation procedure by thoroughly reviewing Chapter 2 “Installation
Instructions.”