The joint should not be disturbed until it has initially set. The chart below shows the recommended initial set and cure times for
ABS,PVCandCPVCinironpipesizediametersaswellasforFlowGuardGold
®
andReUze
®
CTS CPVC.
Joint Curing
*Forrelativehumidityabove60%,allow50%morecuretime.
The above data are based on laboratory tests and are intended as guidelines.
For more specific information, contact should be made with the cement manufacturer.
Recommended Curing Time Before Pressure Testing
Recommended Initial Set Times
Temperature Diameter Diameter Diameter Diameter
Range
1
2
to 1
1
4
1
1
2
to 3
4
to 8
10
to 16
60° - 100° F 15 min 30 min 1 hr 2 hr
40° - 60° F 1 hr 2 hr 4 hr 8 hr
0° - 40° F 3 hr 6 hr 12 hr 24 hr
RELATIVE HUMIDITY CURE TIME CURE TIME CURE TIME CURE TIME
60% or Less* Diameter
1
2
to 1
1
4
Diameter 1
1
2
to 3
Diameter 4
to 8
Diameter 10
to 16
Temperature Range
DuringAssemblyand Upto Above180 Upto Above180 Upto Above180 Upto
Cure Periods 180 psi to 370 psi 180 psi to 315 psi 180 psi to 315 psi 100 psi
60° - 100° F 1 hr 6 hr 2 hr 12 hr 6 hr 24 hr 24 hr
40° - 60° F 2 hr 12 hr 4 hr 24 hr 12 hr 48 hr 48 hr
0° - 40° F 8 hr 48 hr 16 hr 96 hr 48 hr 8 days 8 days
For Primer: double the number of joints shown for cement.
*TheseguresareestimatesbasedonIPSWeld-onlaboratorytests.
Due to many variables in the field, these figures should be used as a general guide only.
*Average number of joints per Quart for Cement and Primer (Source:IPSWeld-on)
Pipe
Diameter
1
2
3
4
1
1
1
2
2
3
4
6
8
10
12
15
18
Number
of Joints 300 200 125 90 60 40 30 10 5 2 to 3 1 to 2
3
4
1
2
INSTALLATION PROCEDURES
A joint should not be pressure tested until it has cured. The
exact curing time varies with temperature, humidity, and
pipe size. The presence of hot water extends the cure time
required for pressure testing. Pressurization prior to joint
curing may result in system failure.