How to Guide

94
Plastics Technical Manual
INSTALLATION PROCEDURES
Solvent Cement Color Primer
Pipe and Diameter Cement (common usage, Description (common usage,
Fitting System (in.) Standard check local code) check local code)
Regularor Not
ABSDWV 1
1
2
-6 ASTMD2235 Black Medium-Bodied Recommended
FlowGuard Gold
®
and
ReUze
®
CTS CPVC
1
2
-2 ASTMF493 Yellow Regular-Bodied Optional
IPS 714 or Oatey CPVC IPS P-70 or Oatey
CPVC Sch. 80
1
2
-2 ASTMF493 HeavyDutyOrange Heavy-Bodied IndustrialGrade
IPS 714 or Oatey CPVC IPS P-70 or Oatey
CPVC Sch. 80 2
1
2
-8 ASTMF493 HeavyDutyOrange Heavy-Bodied IndustrialGrade
ChemDrainMustard 6”andlarger:IPSP-70or
CPVC Sch. 40 ChemDrain 1
1
4
-8 ASTMF493 Yellow(Required) Heavy-Bodied
Oatey Industrial Grade required
Regular or Required
PVCDWVorSch.40Pressure
1
2
-4 ASTMD2564 Clear Medium-Bodied ASTMF656
Mediumor Required
PVCDWVorSch.40Pressure 6-16 ASTMD2564 ClearorGrey Heavy-Bodied ASTMF656
Mediumor Required
PVC Sch. 80
1
4
-2 ASTMD2564 Grey Heavy-Bodied ASTMF656
IPS P-70 or Oatey
PVC Sch. 80 2
1
2
-16 ASTMD2564 Grey Heavy-Bodied IndustrialGrade
1
4 A
1
2 NR
3
8 A
1
2 NR
1
2 A
1
2 NR
3
4 A 1 NR
1 A 1 NR
1
1
4 A 1 NR
1
1
2 A 1 - 1
1
2 NR
2 A 1 - 1
1
2 NR
2
1
2 NR 1
1
2-2 NR
3 NR 1
1
2 - 2
1
2 NR
4 NR 2-3 3
6 NR 3-5 3
8 NR 4-6 7
10 NR 6-8 7
12 NR 6-8 7
14 NR 7-8 7
16 NR 8+ 8
A=AcceptableNR=NotRecommended
NOTICE: Rollers are not recommended.
Nominal Pipe
Size (in.)
Applicator Type
Dauber Brush Width (in.)
Swab Length (in.)
Applicator Types
Solvent Cements
Primers and cements are extremely flammable and may
be explosive. Do not store or use near heat or open
flame, or death or serious injury may occur.
Solvent fumes created during the joining process are
heavier than air and may be trapped in newly installed
piping systems.
Ignition of the solvent vapors caused by spark or flame
may result in injury or death from explosion or fire.
Read and obey all manufacturers' warnings and any
instructions pertaining to primers and cements.
Provide adequate ventilation to reduce fire hazard and
to minimize inhalation of solvent vapors when working
with cements, primers and new piping systems.
NOTICE:Aerosolorspray-ontypeprimers/solventcementsarenotrecommended.Thepracticeofaggressivelyscouringthepipe
andttingswithbothprimerandsolventcementisanintegralpartofthejoiningprocess.Notworkingtheprimerorsolvent
cement into the pipe or fitting could cause potential system failure or property damage.