How to Guide

58
Plastics Technical Manual
General Guidelines for Horizontal Support Spacing (in feet)
Nom.
Pipe
Size
(in.)
PVC PIPE ABS PIPE
SDR 21 PR200 & SDR 26 PR160
Schedule 40 Schedule 80 Schedule 40
Operating Temp. °F Operating Temp. °F Operating Temp. °F Operating Temp. °F
60 80 100 120 140 60 80 100 120 140 60 80 100 120 140 60 80 100 120 140
1
2
3
1
2
3
1
2
3
2
4
1
2
4
1
2
4
2
1
2
2
1
2
5
4
1
2
4
1
2
3
2
1
2
3
4
4
3
1
2
3
2
5
4
1
2
4
2
1
2
2
1
2
5
1
2
5
4
1
2
3
2
1
2
1
4
4
3
1
2
2
5
1
2
5
4
1
2
3
2
1
2
6
5
1
2
5
3
1
2
3
1
1
4
4
4
3
1
2
2
1
2
5
1
2
5
1
2
5
3
3 6
6
5
1
2
3
1
2
3
1
1
2
4
1
2
4
4
2
1
2
6
5
1
2
5
3
1
2
3
6
1
2
6
5
1
2
3
1
2
3
1
2
6
6
5
1
2
3
1
2
3
2
4
1
2
4 4 3
6
5
1
2
5
3
1
2
3
7
6
1
2
6
4
3
1
2
6
6
5
1
2
3
1
2
3
2
1
2
5 5
4
1
2
3
7
6
1
2
6
4
3
1
2
7
1
2
7
1
2
6
1
2
4
1
2
4
3
5
1
2
5
1
2
4
1
2
3
7
7
6
4
3
1
2
8
7
1
2
7
4
1
2
4
7
7
7
4
3
1
2
4
6
5
1
2
5
3
1
2
7
1
2
7
6
1
2
4
1
2
4
9
8
1
2
7
1
2
5
4
1
2
7
1
2
7
1
2
7
4
1
2
4
6
6
1
2
6
1
2
5
1
2
4
8
1
2
8
7
1
2
5
4
1
2
10
9
1
2
9
6
5
8
1
2
8
1
2
8
5
4
1
2
8
7
6
1
2
6
5
9
8
1
2
8
5
4
1
2
11
10
1
2
9
1
2
6
1
2
5
1
2
10
10
9
8
1
2
5
1
2
5
12
11
10
7
6
12
11
1
2
10
1
2
9
1
2
6
1
2
5
1
2
13
12
10
1
2
7
1
2
6
1
2
14
12
11
10
7
6
13
1
2
13
11
8
7
16
12
1
2
11
1
2
10
1
2
7
1
2
6
1
2
14
13
1
2
11
1
2
8
1
2
7
1
2
General Guidelines for
Horizontal Support Spacing (in feet)
Nom.
Pipe
Size
(in.)
1
2
5
1
2
5
1
2
5
4
1
2
4
1
2
2
1
2
4
4
3
1
2
3
3
4
5
1
2
5
1
2
5
1
2
5
4
1
2
2
1
2
5
4
1
2
4
3
1
6 6 6
5
1
2
5
3 5
1
2
5
4
1
2
3
1
1
4
6
1
2
6
1
2
6
6
5
1
2
3 6
5
1
2
5
4
1
1
2
7
7
6
1
2
6
5
1
2
3
1
2
6
1
2
6
5
1
2
4
2
7
7
7
6
1
2
6
3
1
2
7
1
2
7
6
1
2
4
2
1
2
8
7
1
2
7
1
2
7
1
2
6
1
2
4
3
8
8
8
7
1
2
7
4
4
9
9
9
8
1
2
7
1
2
4
1
2
6
10
10
1
2
9
1
2
9
8
5
8
11
11
10
1
2
10
9
5
1
2
10
11
1
2
11
1
2
11
10
1
2
9
1
2
6
12
12
1
2
12
1
2
12
1
2
11
10
1
2
6
1
2
CPVC PIPE
Schedule 80*
Operating Temp. °F
180
60 80 100 120 140
NOTE: Always follow local code requirements for hanger spacing. Most plumbing codes have the following hanger spacing
requirements:
ABS and PVC pipe have a maximum horizontal hanger spacing of every four feet for all sizes.
CPVC pipe or tubing has a maximum horizontal hanger spacing of every three feet for one inch and under and every four
feet for sizes 1
1
4 inch and larger.
DESIGN & ENGINEERING DATA
73 100 140 180
Clevis Hanger
1
2 to 30 in. pipe
Split Ring Hanger
Adj. Swivel Ring
3
4 to 8 in. pipe
Adj. Swivel Ring
1
2 to 8 in. pipe
Roller Hanger
2
1
2 to 20 in. pipe
Double Bolt Pipe Clamp
3
4
to 36 in. pipe
Anchor Strap
1
2 to 4 in. pipe
The pipe should not be anchored tightly by the support, but secured
in a manner to allow for movement caused by thermal expansion
and contraction. It is recommended that you use clamps or straps
that allow pipe to remain away from the framing, thus reducing the
noise generated when pipe is allowed to rub against wood.
Typical Pipe Hangers,
Clamps, and Supports
Operating Temp. °F
SDR 11
*Note: This product is not currently available. Information
provided is for reference only.