How to Guide
112
Plastics Technical Manual
Hydronic Heating, Chilled
Water or Geothermal
Applications
8IFO QMBTUJD QJQJOH JT VTFE GPS SFDJSDVMBUJOH TZTUFNT TVDI
as hydronic, chilled water or geothermal heat pump systems,
careful consideration of piping material characteristics and
system requirements must be made. This includes taking
into account pressure, temperature, flow velocity, design
stresses, environmental factors and the chemical resistance
of the piping materials to the fluids (heat-transfer fluids,
BOUJGSFF[F TPMVUJPOT BOE PUIFS DIFNJDBMT JO UIF TZTUFN
6MUJNBUFMZ UIF FOHJOFFS EFTJHOFS PS PXOFS NVTU FWBMVBUF
these characteristics and system requirements in order
to select the correct piping product for the particular
application. The table below highlights some of the key
points to consider when designing or installing these types
of systems.
This manual is not a complete engineering reference
addressing all aspects of design and installation of these
TZTUFNT .BOZ FYDFMMFOU SFGFSFODFT BSF BWBJMBCMF PO
UIJT UPQJD 5IF *OUFSOBUJPOBM (SPVOE 4PVSDF )FBU 1VNQ
Association: www.igshpa.okstate.edu or The GEO Exchange
at www.geoexchange.org.
“DOs” for all hydronic applications
t %PJOTUBMM$17$4DIFEVMFEPNFTUJDXBUFSTZTUFNTVTJOH
IPS P-70 or Oatey Industrial Grade primers.
t %P JOTUBMM $17$ 4DIFEVMF EPNFTUJD XBUFS TZTUFNT
VTJOH*14PS0BUFZ$17$)FBWZ%VUZ0SBOHFTPMWFOU
cements.
t *OTUBMMJOBDDPSEBODFXJUICPUI$IBSMPUUF1JQFBOE'PVOESZT
BOETPMWFOUDFNFOUNBOVGBDUVSFSTSFDPNNFOEBUJPOTBOE
installation instructions.
t 'PMMPXSFDPNNFOEFETBGFXPSLQSBDUJDFT
t 7FSJGZUIBUUIFNBYJNVNPVUMFUUFNQFSBUVSFBOEQSFTTVSFPG
the boiler is less than the temperature and pressure rating
of the pipe (see charts below).
t "MXBZT VTF UIF QSPQFS EFSBUJOH GBDUPST XJUI 'MPX(VBSE
(PMEBOE$PS[BO$17$QJQFUPmOEUIFQSFTTVSFSBUJOHBU
the applicable operating temperature.
t "MXBZT GPMMPX BQQMJDBCMF DPEFT BOE BQQSPWBMT XIFO
installing plumbing and heating equipment.
t &OTVSFUIBUUIFTZTUFNEFTJHOBMMPXTGPSUIFSNBMFYQBOTJPO
and contraction as recommended in the Charlotte Pipe and
'PVOESZ1MBTUJDT5FDIOJDBM.BOVBM
t 6TFPOMZ$17$YCSBTTUISFBEFEUSBOTJUJPOmUUJOHTXIFO
installing FlowGuard Gold systems.
t 6TFQSPQFSTPMWFOUDFNFOUJOHQSBDUJDFTJODMVEJOHCFWFMJOH
BOEQSPQFSEBVCFSTJ[JOH
t "MJHOBMMQJQJOHTZTUFNDPNQPOFOUTQSPQFSMZXJUIPVUTUSBJO
Do not bend or pull pipe into position after being solvent
welded.
t 1SPWJEFBEEJUJPOBMTVQQPSUUPUIFCSBTTTJEFPGB$17$Y
brass transition or other metallic components to support
the weight of the metal system.
t 6TFDIFDL WBMWFT IFBU USBQT PS CBDL nPX QSFWFOUFST UP
prevent cross-connections between hot and cold water lines.
t 'MVTI UIF JOUFSJPS PG IFBU FYDIBOHFST PS UIF FYUFSJPS PG
condenser coils thoroughly with mild ionic detergent solution
to remove incompatible oils prior to piping installation.
t 3JOTFXJUI DMFBO XBUFS UP QVSHF UIF TZTUFN BT B mOBM
flushing.
t 7FSJGZUIBUBMMCPJMFSDMFBOJOHBOETFBMJOHDIFNJDBMTVTFE
in the hydronic radiant heating system are compatible with
CPVC.
“DON’Ts” for all hydronic applications
t %P OPU FYDFFE UIF PQFSBUJOH UFNQFSBUVSF PS PQFSBUJOH
pressure of the piping system.
t %POPUVTF$17$NBMFPSGFNBMFBEBQUFSTXJUIQMBTUJD
molded threads for FlowGuard Gold systems.
t %POPUVTFUIF$17$QJQJOHTZTUFNUPTVQQPSUBOZNFUBMMJD
components.
t %P OPU VTF DPNQSFTTJPO mUUJOHT GPS IZESPOJD SBEJBOU
heating applications.
t %POPUVTFTPMWFOUDFNFOUUIBUFYDFFETJUTTIFMGMJGFIBT
become discolored or has gelled.
t %POPUVTF$17$UFFTPSPUIFS$17$DPNQPOFOUTBTIPU
SPECIAL CONSIDERATIONS
Prior to installing PVC or CPVC piping in hydronic
applications, it is important to flush the interior of the heat
exchangers and the exterior of the condenser coils
thoroughly with a mild ionic detergent solution to remove
incompatible oils. Failing to do so could result in system
failure and property damage.
Verify that all boiler cleaning and sealing chemicals used in
hydronic radiant heating systems are compatible with PVC
or CPVC. Failure to do so could result in system failure and
property damage.
Equipment leaks in refrigeration or HVAC systems may
release POE oils or other contaminants into the piping
system. These oils and contaminants are incompatible with
PVC or CPVC and such exposure may result in pipe or
fitting failure regardless of flushing.