How to Guide

61
Support Guide
Restraint
L/4
(7)
L/5
(5.6)
L/5 L/5
L/4
2L/5 L/2
(14)
(28)
L
( 30 Run)
(30 Run )
(11.2)
Basic expansion loop requirements for FlowGuard Gold
®
and ReUze
®
CTS CPVC are described below. One or more expansion
loops, properly sized, may be required in a single straight run. The following charts can be used to determine expansion loop
and offset lengths.
Nominal Dia.,
20 40 60 80 100
In.
1
2 16 23 28 32 36
3
4 19 29 33 38 43
1 22 31 38 44 49
1
1
4 24 34 42 48 54
1
1
2 26 37 45 52 59
2 30 42 52 60 67
Expansion Loop Length (L), inches
for
100°F Temperature Change
Length of Run in Feet
LOOP OFFSET CHANGE IN
DIRECTION
Example: Tubing Size = 1/2” Length of run = 60’ L = 28” (from table)
DESIGN & ENGINEERING DATA
Expansion and Contraction of CTS CPVC
ReUze is a registered trademark of Charlotte Pipe and Foundry Company.
FlowGuard Gold is a registered trademark of Lubrizol Corp.
Failure to compensate for expansion and contraction
caused by temperature change may result in system
failure and property damage.
Do not restrict expansion or contraction. Restraining
movement in piping systems is not recommended and
may result in joint or fitting failure.
Use straps or clamps that allow for piping system
movement.
Align all piping system components properly without
strain. Do not bend or pull pipe into position after being
solvent welded.
Do not terminate a pipe run against a stationary object
(example: wall or floor joist).
Do not install fittings under stress.