Installation & Assembly

ASSEMBLING & INSTALLATION INSTRUCTIONS
The drawing shown may not exactly match the product enclosed. However, the
installation instructions do apply to this product.
WARNING! SHUT POWER OFF AT FUSE OR CIRCUIT BREAKER.
ATTENTION! COUPER LE COURANT AU FUSIBLE OU UN DISJONCTEUR.
MOUNTING THE FIXTURE (Fig.1)
1. Shut off the power at the circuit breaker box. Remove old fixture and all
hardware from Junction Box.
2. Carefully unpack your new fixture and lay out all the parts on a clear area.
Take care not to lose any small parts necessary for installation.
3.
Thread the pipe screw part way into the center hole of the single bar and
secure with hex nut.
4.
Attach the single bar to the junction box using two box screws as shown.
The side of the single bar marked “GND” must face out . The junction
box is not included.
5. While holding the lamp body(A) towards the ceiling, connect the electrical
wires as Shown in Fig.2, making sure that all wire nuts are secured. You
may have to wrap the connections with electrical tape. If your outlet has a
ground wire (green or bare copper), connect the fixture ground wire to it.
Otherwise connect fixture’s ground wire directly to the Mounting strap
with the green screw provided. After wires are connected, tuck them
carefully inside the Junction Box.
6. Raise lamp body (A) onto the junction box, aligning pipe screw on single
bar with center hole in lamp body and lock it securely with the ball nut(D).
7. Attach the glass shade(B) to bottom of the lamp holder, then lock it
securely with check ring(C) until sung.
8. Install the light bulbs(not included) in accordance with the fixture’s
specifications. NOTE: DO NOT EXCEED THE SPECIFIED WATTAGE!
Your installation is now complete. Return power to the junction
box and test the fixture.
WHITE
HOUSE
Black
WIRES
(
Hot
)
FIXTURE
WIRES
BLACK
WIRES
FIXTURE
Bare
FIXTURE
WIRES
(Ground)
HOUSE
(
Neutral
)
WIRES
White
Green or
WIRES
HOUSE
Copper(Ground)
GREEN
Thread
FIG.3
FIG.1

Summary of content (1 pages)