Remote Infrastructure Management RIM-600 User Manual

Chapter 1: Installation
33
ON/OFF Switch
The on/off switch connects main power and battery power to the system. In the event that main
power fails, the backup battery system will automatically power the system.
Rear Panel
The rear panel is where the main power cord exits the unit. A 120VAC/60Hz to 8VAC adapter pro-
vides main power to the unit.
Battery Compartment
The battery compartment is located below the top panel. The unit requires (1) 6V 3.4AH
rechargeable battery (included). To remove or replace the battery, remove the top cover with a small
flat-head screwdriver.
Installation
This section provides information on:
n Operating environment
n Rack, wall, & tabletop installation
n Connecting sensors
n Replacing the battery
Parts Required
Phillips DB9 F/F null Dumb terminal or PC
Screwdriver modem cable w/DB9 serial port
Operating Environment
Before you install the RIM-600 Node be sure that your operating environment meets the physical
requirements of the equipment.
Operating Temperature: 32º122º Fahrenheit (0º 50º C)
Humidity: 590 %RH, non-condensing
Power: 120VAC 60 Hz outlet within 6'
Rack Requirements: Standard 19
" equipment rack with supplied mounting bracket
hardware. Requires 1.0 EIA rack mount space.
Tabletop requirements: Flat area which can support an enclosure 10" wide by 8" deep by
2" high.