User manual

Operation
Amhaze™ User Manual Rev. 05 -7-
4. Operation
Preparation
Once installed, you have to prepare the Amhaze™ for operation. To do so, follow these
steps:
Open both ends of the flight case. 1.
Pull out the fluid tank. 2.
Remove the cap of the fluid tank. 3.
Verify that the two plastic hoses attached to the cap are in place and in good 4.
condition.
Pour Chauvet (PHF) haze fluid inside the tank. 5.
Replace the cap of the fluid tank making sure that is tightly closed 6.
Reinsert the tank. 7.
Make sure that the plastic hose that goes from the cap to the hazer is not bent. 8.
To direct the haze up or down, pull the haze guide from the front panel and install it in 9.
the desired position.
Only use CHAUVET® approved (PHF) haze fluid. Otherwise, you might not have
satisfactory results. In addition, the unapproved fluid can damage the Amhaze™, or
cause harm to humans or animals.
Control Panel
Description
Before using the Amhaze™, you should become familiar to the control panel.
The table and diagram below will provide you with a description of its buttons and
functions.
Button
Function
<FUNCTION> Enters the programming mode
<VOLUME> Controls the haze pump to modify the output volume
<TIMER> Starts the timer controlled operation
<STOP> Stops the current operation, whether manual or timer controlled
<ENTER>
Enables the currently displayed menu or sets the currently selected value
in to the current function
<UP>
Navigates upward through the menu list and increases the numeric value
when in a function
<DOWN>
Navigates downward through the menu list and decreases the numeric
value when in a function
Control Panel Diagram