Installation Manual
Table Of Contents
- Statements
- Guide Conventions
- 1
- Background
- F10 System Hardware
- System Diagrams
- Grouping Multiple Antennas
- 2 x 1 Meter Configuration
- 2
- Antenna Distance from Interfering Elements
- System Performance Considerations
- Determining the Electronics Location
- Environmental Considerations
- Site Survey Conclusion
- 3
- Requirements
- Installation Outline
- F10, 1 Meter and 2 Meter Floor Cuts
- Common Wider Floor Cuts
- Mounting the Electronics Enclosure
- Mounting the Power Supply
- Finishing Installation
- 4
- Antenna Wiring
- Wiring the 2 x 1 Meter System
- Overview
- Wiring Between F10 Systems for Sync
- Wiring peripherals
- 5
- System Setup Using DMS
- Application-Based Detection Modes
- Alarm Severity
- Configuring SAM (Smart Alarm Management)
- Updating the System
- 6
- TR4215 Features
- Basic Tuning Methods Using DMS
- Noise Sources
- Analog View
- Evaluate Jumper Positions
- Configuring the System for Asynchronous Noise
- Resonance Sources
- Data Retrieval
- A
- Power Supply Details
- B
- F10 Parts List
- C
- F10 System – Proximity to Deactivation Units
- F10 System – Proximity to Other Systems
- D
- F10, 2 Meter System
- F10, 1 Meter System
F10 Installation Manual Rev. *60 13 of 71
CHAPTER
2
SITE SURVEY
Overview
Checkpoint Field Service personnel visit the location to perform a site survey before installation.
The initial planning stage is the appropriate time to determine site suitability, where the antenna
loops will be located (for maximum EAS protection) and the type of systems to be installed.
Antenna Distance from Interfering Elements
Nearby elements and underlying flooring materials may cause interfering effects. Therefore,
antenna placement must be carefully evaluated before installation. Your goal is to identify a
location where ambient noise and environmental factors do not degrade system performance.
For repeatability, all measurements are given at baseline (i.e. using a standard tag type).
Figure 2.1 Distances from Interfering Elements