Installation Manual

Table Of Contents
F10 Installation Manual Rev. *60 16 of 71
CHAPTER
3
PHYSICAL INSTALLATION
Chapter Outline
This chapter offers diagrams and lists steps for physical installation of the major system hardware:
1. Requirements: Lists the tool and part requirements for a typical installation.
2. Installation Outline: Lists all of the basic installation steps as a sequence.
3. Cut Diagrams: How to plan/make cuts for proper installation of the antenna assembly,
Impedance matching board, and plan/route the wiring of the coax cable.
4. Mounting the Electronics: How to install the electronics enclosure and power supply.
Requirements
Tools
The following tools may be required for F10 system installations:
Arrow T-25 Staple Gun
Diagonal wire cutter
Hammer drill with 3/16” and 1/2” bits
Extension cord
Tape Measure
Hammer
Marker, Black Felt
Ratchet driver with 9/16” socket
Screwdrivers: mini, regular and #2 Phillips
Hacksaw
Utility knife
Wire Snake
Wire Strippers
Wrench, combination end 9/16”
Checkpoint Systems Field Service Diagnostic Management Software (DMS version
1.8.31 or later version) installed on a laptop with the appropriate cables.