Installation Manual
Table Of Contents
- Statements
- Guide Conventions
- 1
- Background
- F10 System Hardware
- System Diagrams
- Grouping Multiple Antennas
- 2 x 1 Meter Configuration
- 2
- Antenna Distance from Interfering Elements
- System Performance Considerations
- Determining the Electronics Location
- Environmental Considerations
- Site Survey Conclusion
- 3
- Requirements
- Installation Outline
- F10, 1 Meter and 2 Meter Floor Cuts
- Common Wider Floor Cuts
- Mounting the Electronics Enclosure
- Mounting the Power Supply
- Finishing Installation
- 4
- Antenna Wiring
- Wiring the 2 x 1 Meter System
- Overview
- Wiring Between F10 Systems for Sync
- Wiring peripherals
- 5
- System Setup Using DMS
- Application-Based Detection Modes
- Alarm Severity
- Configuring SAM (Smart Alarm Management)
- Updating the System
- 6
- TR4215 Features
- Basic Tuning Methods Using DMS
- Noise Sources
- Analog View
- Evaluate Jumper Positions
- Configuring the System for Asynchronous Noise
- Resonance Sources
- Data Retrieval
- A
- Power Supply Details
- B
- F10 Parts List
- C
- F10 System – Proximity to Deactivation Units
- F10 System – Proximity to Other Systems
- D
- F10, 2 Meter System
- F10, 1 Meter System
F10 Installation Manual Rev. *60 16 of 71
CHAPTER
3
PHYSICAL INSTALLATION
Chapter Outline
This chapter offers diagrams and lists steps for physical installation of the major system hardware:
1. Requirements: Lists the tool and part requirements for a typical installation.
2. Installation Outline: Lists all of the basic installation steps as a sequence.
3. Cut Diagrams: How to plan/make cuts for proper installation of the antenna assembly,
Impedance matching board, and plan/route the wiring of the coax cable.
4. Mounting the Electronics: How to install the electronics enclosure and power supply.
Requirements
Tools
The following tools may be required for F10 system installations:
Arrow T-25 Staple Gun
Diagonal wire cutter
Hammer drill with 3/16” and 1/2” bits
Extension cord
Tape Measure
Hammer
Marker, Black Felt
Ratchet driver with 9/16” socket
Screwdrivers: mini, regular and #2 Phillips
Hacksaw
Utility knife
Wire Snake
Wire Strippers
Wrench, combination end 9/16”
Checkpoint Systems Field Service Diagnostic Management Software (DMS version
1.8.31 or later version) installed on a laptop with the appropriate cables.