Installation Manual
Table Of Contents
- Statements
- Guide Conventions
- 1
- Background
- F10 System Hardware
- System Diagrams
- Grouping Multiple Antennas
- 2 x 1 Meter Configuration
- 2
- Antenna Distance from Interfering Elements
- System Performance Considerations
- Determining the Electronics Location
- Environmental Considerations
- Site Survey Conclusion
- 3
- Requirements
- Installation Outline
- F10, 1 Meter and 2 Meter Floor Cuts
- Common Wider Floor Cuts
- Mounting the Electronics Enclosure
- Mounting the Power Supply
- Finishing Installation
- 4
- Antenna Wiring
- Wiring the 2 x 1 Meter System
- Overview
- Wiring Between F10 Systems for Sync
- Wiring peripherals
- 5
- System Setup Using DMS
- Application-Based Detection Modes
- Alarm Severity
- Configuring SAM (Smart Alarm Management)
- Updating the System
- 6
- TR4215 Features
- Basic Tuning Methods Using DMS
- Noise Sources
- Analog View
- Evaluate Jumper Positions
- Configuring the System for Asynchronous Noise
- Resonance Sources
- Data Retrieval
- A
- Power Supply Details
- B
- F10 Parts List
- C
- F10 System – Proximity to Deactivation Units
- F10 System – Proximity to Other Systems
- D
- F10, 2 Meter System
- F10, 1 Meter System
F10 Installation Manual Rev. *60 19 of 71
Floor Cut Depth
F10, 1 meter and 2 meter Antennas are identical, so the trough’s floor cut depth (height) is always
consistent. Recommended depth is 7.6cm [3in] for optimum structural integrity. This allows
approximately 3.75cm [1.5in] of concrete top fill covering each antenna (as shown in Figure 3.3).
Figure 3.3 Side View of Trough
Figure 3.4 Antenna Installed (not buried until after testing)
In scenarios where the flooring does NOT physically allow such depth, it is acceptable to cover
the antenna assembly with less than 1.5 inches of concrete fill. Although it is uncommon, when
covering with tile or wood flooring, the system can be installed flush to the concrete’s surface.
Figure 3.5 Flush Depth
Note: If installing in a location that violates the recommended 7.6cm [3in] depth specification, inform
Checkpoint Project Management.