Installation Manual
Table Of Contents
- Statements
- Guide Conventions
- 1
- Background
- F10 System Hardware
- System Diagrams
- Grouping Multiple Antennas
- 2 x 1 Meter Configuration
- 2
- Antenna Distance from Interfering Elements
- System Performance Considerations
- Determining the Electronics Location
- Environmental Considerations
- Site Survey Conclusion
- 3
- Requirements
- Installation Outline
- F10, 1 Meter and 2 Meter Floor Cuts
- Common Wider Floor Cuts
- Mounting the Electronics Enclosure
- Mounting the Power Supply
- Finishing Installation
- 4
- Antenna Wiring
- Wiring the 2 x 1 Meter System
- Overview
- Wiring Between F10 Systems for Sync
- Wiring peripherals
- 5
- System Setup Using DMS
- Application-Based Detection Modes
- Alarm Severity
- Configuring SAM (Smart Alarm Management)
- Updating the System
- 6
- TR4215 Features
- Basic Tuning Methods Using DMS
- Noise Sources
- Analog View
- Evaluate Jumper Positions
- Configuring the System for Asynchronous Noise
- Resonance Sources
- Data Retrieval
- A
- Power Supply Details
- B
- F10 Parts List
- C
- F10 System – Proximity to Deactivation Units
- F10 System – Proximity to Other Systems
- D
- F10, 2 Meter System
- F10, 1 Meter System
F10 Installation Manual Rev. *60 30 of 71
15. The right side antenna is wired in reverse. Red connects to pin 1, yellow to pin 2, etc.
Side Pin Number Antenna Wiring
Antenna 1
(Left)
J2-1
Green
J2-2
Black
J2-3
Yellow
J2-4
Red
Antenna 2
(Right)
J2-1
Red
J2-2
Yellow
J2-3
Black
J2-4
Green
Table 4.1 F20 Antenna Wire Pinout
16. Verify the correct pin-out using the above table.
Note: Before closing the lid, it is necessary to first evaluate system performance. Refer to Evaluate Jumper
Positions.
17. Ensure that all the connections are secure (gently pull on the leads at the connection point to
the circuit board). Carefully position the wires inside, then close the Junction Box lid (tighten
all 4 screws). Be careful not to tear or twist the foam gasket on the lid when tightening the
screws.
Note: In instances where multiple electronics and coax cables are used, ensure that floor trenches or
conduits are spaced 5cm [approx. 2in] apart.