Installation Manual
Table Of Contents
- Statements
- Guide Conventions
- 1
- Background
- F10 System Hardware
- System Diagrams
- Grouping Multiple Antennas
- 2 x 1 Meter Configuration
- 2
- Antenna Distance from Interfering Elements
- System Performance Considerations
- Determining the Electronics Location
- Environmental Considerations
- Site Survey Conclusion
- 3
- Requirements
- Installation Outline
- F10, 1 Meter and 2 Meter Floor Cuts
- Common Wider Floor Cuts
- Mounting the Electronics Enclosure
- Mounting the Power Supply
- Finishing Installation
- 4
- Antenna Wiring
- Wiring the 2 x 1 Meter System
- Overview
- Wiring Between F10 Systems for Sync
- Wiring peripherals
- 5
- System Setup Using DMS
- Application-Based Detection Modes
- Alarm Severity
- Configuring SAM (Smart Alarm Management)
- Updating the System
- 6
- TR4215 Features
- Basic Tuning Methods Using DMS
- Noise Sources
- Analog View
- Evaluate Jumper Positions
- Configuring the System for Asynchronous Noise
- Resonance Sources
- Data Retrieval
- A
- Power Supply Details
- B
- F10 Parts List
- C
- F10 System – Proximity to Deactivation Units
- F10 System – Proximity to Other Systems
- D
- F10, 2 Meter System
- F10, 1 Meter System
F10 Installation Manual Rev. *60 58 of 71
Figure 6.3 Noise on Filter View A – Results After RF Gain Tuning
3. After the RF gain is adjusted, observe Filter View D for about 15-30 seconds and note the
peak response during this period. Below is a picture before adjusting the RX gain.
Figure 6.4 Noise on Filter View D – Graph Before RX Gain Tuning
4. Adjust RX gain (software gain) until the Noise begins to peak into the Analog View D.
Figure 6.5 below shows a properly tuned system.