User's Manual

2-3 Liberty UHX Upgrade Guide
3 Checkpoint Technician removes the existing bolt anchors in one of the following ways:
Break
Cut
Pound down
4 Since the footprint of all QS pedestals is 12 inches by 3 1/2 inches, the existing bolt
anchor holes will need to be filled in because these holes cannot be reused for Liberty
UHX installations.
Estimated completion time
Removal of the legacy QS2000 pedestal will take approximately 30 minutes per single
pedestal.
Removing bumper posts
QS2000 pedestal may have a bumper post installed on either side of the pedestal to protect
the pedestal from damage. These bumper posts should be removed and the post holes
filled in with concrete. Instead of bumper posts, the new Liberty UHX pedestals are
installed on top of metal risers. The riser elevates the base of the Liberty UHX pedestal off
of the floor to protect it from being damaged.
To remove the existing bumper posts:
1 Checkpoint contractors remove flooring.
2 Checkpoint contractors remove both bumper posts.
3 Checkpoint contractors fill in bumper post holes with concrete.
Estimated completion time
Removal of each bumper post will take approximately 15 minutes plus time for concrete.
This can vary by Checkpoint contractor.