User's Manual

4-1 Liberty UHX Upgrade Guide
C HAPTER
C
HAPTER
0
L
IBERTY
UHX I
NSTALLATION
C
HECKLIST
A site survey will be conducted by a team composed of both customer and Checkpoint
personnel. Once a site survey is reviewed by both parties, Checkpoint will detail store
specific information in a customer-specific version of the sample Installation Checklist
shown below.
Installation Checklist
General Information
___________________ and Checkpoint will collaborate on upgrading existing EAS
installed Target Stores to Liberty UHX with Riser Baseplates.
The installation start time will be ____ PM for both Checkpoint and _____________.
Store hours may vary; work will begin at the Store Manager’s discretion. Speaking to
the Store Manager prior to the installation time is recommended.
If the Checkpoint contractors are not onsite by ____ PM, the Checkpoint Technician
should contact __________________’s POC (Point Of Contact).
If Checkpoint is not onsite by ____ PM, the Checkpoint contractor should contact the
Onsite Project Coordinator.