User's Manual

Liberty UHX Installation Checklist: Installation Checklist 4-6
***Please Fax completed checklist to _______________ at _________________.
Table 4.4
Door installation checklist
Item
#
Door Designation (i.e., North Door)
No? Explain
Below
Customer
Initials
Checkpoint
Initials
Checkpoint
Contractor
Initials
A New layout agreed upon?
B Replacement mat acquired, if necessary
C Existing pedestals removed and disposed of?
D Old drill holes repaired? (if necessary)
E Floor mats removed?
F Alvarado posts removed and disposed of?
G Alvarado bumper post holes filled in? (if necessary)
H New floor channel cut?
I Walker duct and power supply boxes installed?
J Power ran from ceiling to floor?
K Power ran from walker duct to pedestal riser?
L Wires crimped and power connectors installed?
M Cat 5 cable ran and terminated at pedestal riser?
N Floor cut caulked and/grouted?
O Floor covering repaired/installed/replaced?
P Work area is clean and ready for store opening?
Q Pedestals tested and properly functioning for EAS?
R Pedestals tested and properly functioning for UHF?
Explanation of negative responses or further comments
Table 4.5
Project Signoff Sheet
Representative Name (Print) Signature
Target
Checkpoint
Checkpoint
Contractor
Table 4.6
Store specific information
Store # City: State: Date: