The following table outlines the responsibilities for each installation group. The tasks are
listed in the order they should be completed.
*Note: Replacement mats are ordered and maintained by Target. It is important for
Checkpoint personnel to review the site survey and determine necessity of mats. If
replacement mats are required, Checkpoint personnel must notify Target to have mats
ordered and delivered in time for the upgrade to the existing pedestals. As a precautionary
measure, Checkpoint technicians will carry a 15 by 10 foot mat to all installations.
Table 0.1
Installation/upgrade task list
Responsibility (Task) Installation Group
*Acquiring replacement mat, if necessary Target
Removing existing pedestals Checkpoint
Repairing old drill holes, if necessary Checkpoint Contractor
Removing existing floor mats Checkpoint Contractor
Removing any bumper posts, if necessary Checkpoint Contractor
Filling in old bumper post holes, if necessary Checkpoint Contractor
Cutting new floor channel (trench) Checkpoint Contractor
Installing walker duct Checkpoint Contractor
Installing power supply boxes Checkpoint Contractor
Running power from ceiling to floor Checkpoint
Running power in walker duct to pedestals base Checkpoint
Crimping power wires and installing connectors Checkpoint
Running CAT 5 network cable and terminate at the power supply with
appropriate length
Target
Running CAT 5 network cable from power supply to floor Checkpoint Contractor
Running CAT 5 network cable in walker duct to pedestal base Checkpoint
Installing connectors on the CAT 5 network cable Target
Testing network connectivity Target
Connecting CAT 5 cable to pedestal riser Checkpoint
Connection power to pedestal riser Checkpoint
Installing new pedestals Checkpoint
Replacing floor mats, if necessary Checkpoint Contractor
Testing new pedestals for EAS Checkpoint
Testing new pedestals for UHF Checkpoint